ICICS/CS Heat Recovery Chiller

ICICS/CS Heat Recovery Chiller

The Institute for Computing, Information, and Cognitive Systems/Computer Science building (ICICS/CS) is a 60,000 square foot state-of-the-art, computer science technology research facility at UBC. The facility includes eight shared labs and 38 dedicated labs. A wide range of research is conducted at ICICS/CS, including biomedical, robotics, multimedia processing, wireless communications, nanotechnology and computational intelligence research. […]

Aquatic Centre

Aquatic Centre

Condensate Heat Recovery Project UBC helped FortisBC to pilot its Commercial Custom Design Program – Retrofit Projects initiative in 2012. The program helps natural gas customers like UBC by providing funding for a detailed energy study, and for capital upgrades needed to reduce natural gas consumption. The UBC Aquatic Centre participated in the pilot by implementing a condensate […]

Air Filter Replacement Program

Air Filter Replacement Program

One of hundreds of Air Handling Units bringing air into UBC buildings UBC is in the process of replacing all the Heating, Ventilation, and Air Conditioning (HVAC) system air filters on campus over the next three years. There are over 10,000 air filters in more than 1,500 HVAC systems on campus—so choosing the right air filter can […]

Coil Cleaning

Coil Cleaning

Dirt may be in the form of pollen, fabric fibres, hair, rust, tobacco smoke or even mould. Whatever its form, all dirt has the same effect on Heating, Ventilation, and Air Conditioning (HVAC) system coils—it blocks the airflow, degrades heat transfer, and wastes energy. The UBC Energy Planning and Innovation (EPI) group joined forces with Building Operations, […]

Centre for Comparative Medicine – Boiler retrofit

Boiler Retrofit Project The UBC Centre for Comparative Medicine was completed in 2012. The centre provides animal care and is the most energy intensive building on campus. Shortly after the centre became operational, UBC’s Energy Planning and Innovation (EPI) group discovered large quantities of standby steam being vented from the building. Not only was the […]

Pharmaceutical Sciences energy conservation

Pharmaceutical Sciences energy conservation

The Pharmaceutical Sciences building is one of UBC’s newest and most mechanically advanced buildings. Housing not only the Pharmaceutical Sciences program but also the campus’s main data centre, the building’s heating, ventilation, and air conditioning (HVAC) system demands are high. The building is roughly 246,000 square feet in area and contains offices, teaching lab, research laboratories, […]

Biological Sciences West

Biological Sciences West

UBC’s Biological Sciences West Building UBC completed a major renovation on the Biological Sciences West building in 2012, which included replacing its mechanical system. Upon investigation in 2014, we found that the building’s highly advanced heating and cooling system wasn’t running optimally. The building’s hot water loop was being heated using steam, but the cooling […]