Archives by date

You are browsing the site archives by date.

Grab a sweater and prepare for a cooler campus

The weather outside is cooling down, which means its time to wear warmer layers and close our windows to stay comfortable and save energy over the winter.

Hebb Building Renewal featured in October issue of Award

The iconic Thompson Berwick and Pratt-designed Hebb Building and Theatre at UBC Vancouver have undergone a significant renewal that is sure to wow physics and astronomy students, faculty, and staff when the building officially opens in January 2020.

Stephen Li joins Building Operations as Mechanical Engineer

Stephen is a Professional Mechanical Engineer and LEED Green Associate with over ten years’ experience in Metro Vancouver’s building consulting industry.