Completed projects

A selection of completed projects

  • Earth Sciences Building – Water Conservation through Scrubber Decommissioning

    UBC’s Earth Sciences Building uses acid scrubbers to treat fume hood exhaust prior to the fumes entering the exhaust fans. The original fume hood exhaust design utilized fans with metal blades, which were susceptible to corrosion and required water scrubbers…

    Read more: Earth Sciences Building – Water Conservation through Scrubber Decommissioning
  • David Strangway Building – LED Lighting Retrofit

    UBC Facilities’ Energy and Water Services’ (EWS) mission is to generate energy for the campus, conserve and reduce wasted energy, and eliminate GHG emissions to achieve UBC’s Climate Action Plan, approved by the UBC Board of Governors in 20211. UBC…

    Read more: David Strangway Building – LED Lighting Retrofit
  • Campus-Wide Installation of Occupancy Sensors for Building Optimization

    One of the missions of UBC Facilities’ Energy and Water Services (EWS) is to conserve and reduce energy, waste, and eliminate greenhouse gas emissions to support UBC’s Climate Action Plan, approved by the UBC Board of Governors in 20211. To…

    Read more: Campus-Wide Installation of Occupancy Sensors for Building Optimization
  • University Services Building – Roof Renewal

    Project Snapshot Project Size: 83,000 square feet Project Manager: Infrastructure Development – Project Services Project Summary The University Services Building – Roof Renewal replaced the current 83,000 sf, gravel ballast flat roof with a similar assembly, complete with upgraded insulation…

    Read more: University Services Building – Roof Renewal
  • UBC Okanagan Charles E. Fipke Centre for Innovative Research

    Project Snapshot Project Sponsor: I.K. Barber School of Arts & Science Project Size: 73,446 ft2 Budget: $30.502 million Occupancy: September 2008 Project Manager: UBC Properties Trust Architect: Kasian Architecture Construction Manager: Stuart Olson Sustainability: 5 Green Globes

    Read more: UBC Okanagan Charles E. Fipke Centre for Innovative Research
  • Marine Drive Student Residences – Phase 2

    Project Snapshot Project Sponsor: UBC Student Housing & Hospitality Services Project Size: 609,000 ft2 Budget: $102.925 million Occupancy: May 2009 Project Manager: UBC Properties Trust Architect: Hotson Bakker, Boniface Haden Construction Manager: Scott Construction Number of Beds: 1,067

    Read more: Marine Drive Student Residences – Phase 2
  • UBC Okanagan University Centre (Meekison Centre)

    Project Snapshot Project Sponsor: UBCO Student Services Project Size: 75,000 ft2 Budget: $33.130 million Occupancy: June 2009 Project Manager: UBC Properties Trust Architect: Stantec Architecture/Meicklejohn Architects Construction Manager: Sawchuk Developments

    Read more: UBC Okanagan University Centre (Meekison Centre)
  • UBC Okanagan Student Housing Phase 3

    Project Snapshot Project Sponsor: UBC Student Housing & Hospitality Services Project Size: 115,903 ft2 Budget: $24.751 million Occupancy: September 2009 Project Manager: UBC Properties Trust Architect: HMA Construction Manager: Sawchuk Developments Number of Units: 356

    Read more: UBC Okanagan Student Housing Phase 3
  • Beaty Biodiversity Research Centre

    Project Snapshot Project Sponsor: Faculty of Science Project Size: 122,925 ft2 Budget: $49.0 million Occupancy: May 2009 (Phase 1) / May 2010 (Museum) Project Manager: UBC Properties Trust Architect: Patkau Architects Construction Manager: Scott Construction Project Summary A new change…

    Read more: Beaty Biodiversity Research Centre
  • School of Population & Public Health (SPPH)

    Project Snapshot Project Sponsor: School of Population & Public Health Project Size: 30,000 ft2 Budget: $7.819 million Occupancy: Sep 2010 Project Manager: UBC Properties Trust Architect: Kasian Architecture Construction Manager: Donovan Management

    Read more: School of Population & Public Health (SPPH)