Archives by date

You are browsing the site archives by date.

The Hennings Building Roof Renewal is underway 

Estimated construction dates: August 25 – October 31, 2025. This project will renew the aging Hennings Building roof systems, remove redundant mechanical systems, and complete localized, minimally invasive seismic improvements.  

Safety bollards play a critical role in protecting our campus community

Safety bollards are essential to provide a protective barrier that helps prevent accidents and potential harm to pedestrians. However, we’ve recently received reports of bollards being lowered and not raised again or damaged due to vehicles driving through without properly lowering and resetting them.

UBC Smart Hydrogen Energy District (SHED) wins Green Building Award

UBC Smart Hydrogen Energy District (SHED) was awarded the Sustainable Architecture and Building (SAB) Magazine Green Building Commercial/Industrial (Small) Award. The SHED serves a hydrogen fueling spot as well as an educational hub and urban design showcase. The award jury appreciated the SHED’s thoughtful integration into the public realm of the campus and its welcome […]