Preparing for the planned School of Biomedical Engineering Building
The Demolition of the DH Copp Building began last month for the development of the new School of Biomedical Engineering Building, a partnership between the Faculty of Medicine and Faculty of Applied Science, and a top strategic priority for the University and both Faculties.
Preparing for the planned School of Biomedical Engineering Building
The Demolition of the DH Copp Building began last month for the planned development of the new School of Biomedical Engineering Building (SBME), a partnership between the Faculty of Medicine and Faculty of Applied Science, and a top strategic priority for the University and both Faculties. The vision of the School is to transform patient health […]
UBC Water Supply Centre now running campus water supply
The aging water pump station located in the Power House is now disconnected from the University Boulevard transmission main, and the new UBC Water Supply Centre is fully running the campus water distribution.
Enjoy the cherry blossoms on UBC Vancouver campus
In collaboration with UTown@UBC, Building Operations created and installed seasonal photo frames for the campus community to enjoy the short blossom season.
COVID-19 safety
With the recent increase in COVID-19 cases in BC, including increasing cases involving more easily transmitted COVID-19 variants, it is more important than ever for each and every one of us to follow required safety protocols when working on campus.