Future Projects

We are constantly working and planning to meet the future requirements of a world class university.

  • UBC Okanagan FIRE (Fire Innovation, Research and Education Facility)

    The Okanagan Wildfire Lab will be Canada’s first advanced wildfire science facility dedicated to wildfire behavior and resiliency testing.

    Read more: UBC Okanagan FIRE (Fire Innovation, Research and Education Facility)
  • Science Central Two – Chemistry Laboratory Complex (Research)

    Project Snapshot Project Size: 11,360 gross sq metres Budget: $156 million estimate Status: TBD Reduced Deferred Maintenance: $36.9 million Project Summary Of the Chemistry Complex’s five older buildings, only two have been renewed. The remaining three buildings will be replaced…

    Read more: Science Central Two – Chemistry Laboratory Complex (Research)
  • Master of Physical Therapy & Occupational Therapy (MPT-MOT) Expansion – Kelowna

    Project Snapshot Project Size: 2,409 gross square metres Budget: $33 million estimate Status: TBD Project Summary UBCO is assessing options to purchase and renovate space in an existing commercial building to support the Masters of Physical Therapy (MPT) and the…

    Read more: Master of Physical Therapy & Occupational Therapy (MPT-MOT) Expansion – Kelowna
  • UBCO Student Housing Expansion

    Project Snapshot Project Size: TBD Budget: $120 million estimate Status: TBD Project Summary Student Housing and Community Services (SHCS) and Campus + Community Planning (C+CP) have developed a high-level, two-phase concept to increase campus housing at UBC Okanagan. Phase 1…

    Read more: UBCO Student Housing Expansion
  • Applied One

    Project Snapshot Project Size: 27,844 gross square metres Budget: $388 million estimate Status: TBD Occupancy: Project Manager: Project Summary Applied One will be a new centre for the Faculty of Applied Science which will house integrated interdisciplinary maker, research and…

    Read more: Applied One
  • Medicine One

    Project Snapshot Project Size: 30,195 gross square metres Budget: $680 million estimate Status: TBD Project Summary The Faculty of Medicine (FoM) proposes a new flagship Medicine 1 Building (MED-1) at the UBC Vancouver campus to provide much-needed flexible, state-of-the-art, high-infrastructure,…

    Read more: Medicine One
  • Mathematics Building

    Project Snapshot Project Size: 15,655 gross square metres Budget: $185 million estimate Status: TBD Occupancy: Project Manager: Project Summary The Department of Mathematics at UBC is one of the strongest mathematics departments in Canada. It is ranked 26th in world and…

    Read more: Mathematics Building
  • Science Central One – Chemistry Laboratory Complex (Teaching)

    Project Snapshot Project Size: 14,177 gross sq metres Budget: $195 million estimate Status: TBD Reduced Deferred Maintenance: $36 million Project Summary Of the Chemistry Complex’s five older buildings, only two have been renewed. The remaining three buildings will be replaced…

    Read more: Science Central One – Chemistry Laboratory Complex (Teaching)
  • UBCO Childcare (UBC Okanagan)

    Project Snapshot Project Size: 5,000 gross sq feet / 464 gross square metres Budget: $3.3 million Status: In design Occupancy: TBD Project Manager: Infrastructure Development – Project Services Project Summary Since its inception in 1992, the existing Child Care Centre…

    Read more: UBCO Childcare (UBC Okanagan)