- Lower Mall Precinct Student Housing Redevelopment – Phase 1
- Anthropology and Sociology (ANSO) Building Renewal
- UBC Sauder School of Business Power House Expansion Project
- Laboratory of Archaeology at Iona
- Faculty of Applied Science Digital Design Studio
- Beaty Biodiversity Centre Addition
- Renewal of the Jack Bell Building for the School of Social Work
- Physical Therapy & Occupational Therapy (Surrey Expansion)
- UBCO Downtown Project (UBC Okanagan)
- x̌əl sic snpax̌nwixʷtn (UBC Okanagan)
- Recreation Centre North
- Gateway Building (Nursing, Kinesiology, UBC Health & Integrated Student Health Services)
- Public Realm Projects
- UBCO Student Housing Expansion
- Master of Physical Therapy & Occupational Therapy (MPT-MOT) Expansion – Kelowna
- UBC Okanagan FIRE (Fire Innovation, Research and Education Facility)
- UBCO Childcare (UBC Okanagan)
- Science Central One - Chemistry Laboratory Complex (Teaching)
- Science Central Two - Chemistry Laboratory Complex (Research)
- Mathematics Building
- Medicine One
- Applied One
- University Services Building – Roof Renewal
- David Strangway Building – LED Lighting Retrofit
- Earth Sciences Building – Water Conservation through Scrubber Decommissioning
- Campus-Wide Installation of Occupancy Sensors for Building Optimization
- First Nations Longhouse Expansion
- Academic District Energy System - Steam to Hot Water Conversion
- Food and Beverage Innovation Centre
- A walk through time
- UBC Water Pump Station
- Solar Array: Clean Connected and Safe Transportation Testbed
- Douglas T. Kenny Building (Psychology) Fourth Floor Renovation
- Hydrogen Refueling Station: Clean Connected and Safe Transportation Testbed
- Macleod Building Renewal
- The Chung | Lind Gallery - Irving K. Barber Learning Centre
- Arts Student Centre
- MacInnes Field Parkade
- UBC Exchange (New Transit Bus Terminal)
- Brock Commons South
- tə šxʷhəleləm̓s tə k̓ʷaƛ̓kʷəʔaʔɬ
- Gordon B. Shrum Building (formerly School of Biomedical Engineering Building)
- UBC Okanagan Skeena Residence
- UBC Okanagan Nechako Residence and Commons Block
- MOA Great Hall Renewal
- UBC Okanagan Teaching & Learning Centre
- Bioenergy facility expansion
- UBC Pacific Museum of Earth: Elasmosaurus skeleton
- The Shadow
- HEBB Building Renewal
- Undergraduate Life Sciences Teaching Laboratories – Renewal and Expansion
- UBC Life Building (Old Student Union Building Renewal)
- c̓əsnaʔəm House
- New Sports Medicine Centre - Chan Gunn Pavilion
- Exchange Residence at Gage South
- Back up generator Life Sciences Centre
- Brock Commons Phase 1 - Tallwood House
- Indian Residential School History & Dialogue Centre
- Museum of Anthropology Northwest Coast Masterworks Gallery
- National Soccer Development Centre - UBC Athletics and Vancouver Whitecaps Football Club Soccer Training Facility
- Forest Sciences Centre Haida Looplex X
- Stewart Blusson Quantum Matter Institute (QMI) – AMPEL/Brimacombe Expansion
- Henry Angus Tower Seismic Upgrades
- New Aquatic Centre
- Djavad Mowafaghian Centre for Brain Health
- Orchard Commons Mixed - Use Student Housing & Vantage College
- Ponderosa Commons Phase 2
- New Greenhouse Facilities at Botanical Gardens
- Life Sciences Centre Heat Recovery Chiller
- Baseball Training Facility
- Engineering Student Centre
- HEBB 100 seismic upgrade and theatre modernization
- Robert H Lee Alumni Centre
- The Nest: AMS Student Union Building (SUB)
- The Centre for Occupational Health, Safety and Wellbeing
- Bookstore Expansion and Renovation
- Temporary Energy Centre (TEC)
- Yurt Installation UBC Farm
- The Office of the President
- UBC / UNA Skatepark UBC Public Realm
- Electric Vehicle Charging Stations
- Gerald McGavin UBC Rugby Centre
- Aquatics Research Laboratories, Bio Sci Building
- Pharmaceutical Sciences/Centre for Drug Research & Development Building
- Earth Sciences Building
- Sauder School of Business
- Conservation of the Haida House Roof
- UBC Okanagan Student Housing Phase 4 - Purcell Residence
- həm̓ləsəm̓ and q̓ələχən
- Norman B. Keevil Institute of Mining Engineering
- Allard Hall - Faculty of Law Building
- UBC Okanagan Engineering Management & Education Building
- Wayne & William White Engineering Design Centre
- Centre for Interactive Research on Sustainability
- Tennis Facility
- UBC Okanagan Health Sciences Centre
- Rodney Graham Landau Pavilion
- UBC Okanagan Student Housing Phase 3B - Cassiar Residence
- UBC Okanagan Arts & Science 2
- School of Population & Public Health (SPPH)
- Beaty Biodiversity Research Centre
- UBC Okanagan Student Housing Phase 3
- UBC Okanagan University Centre (Meekison Centre)
- Marine Drive Student Residences - Phase 2
- UBC Okanagan Charles E. Fipke Centre for Innovative Research
UBC Water Pump Station

Project Snapshot
Occupancy: Spring 2022
Budget: $12 million
Project Manager: UBC Project Services – Elizabeth Meagher
Architect: Stantec
Construction Manager: Heatherbrae Builders
Project Summary
The new Water Pump Station will house an important piece of UBC’s campus infrastructure serving approximately 70% of the campus demand for domestic cold water, and operating water pumps that increase water pressure to aid fire fighting in the academic core. The construction of the Water Supply Centre would primarily support:
Seismic Resilience: The new pump station will improve the seismic resilience of the campus by removing the critical risk that the water distributions system would not be functional due to the collapse of the current Power House. The Seismic Resilience Plan update report delivered to the Board of Governors in September 2017 identified the current location of the pump station within the Power House as a “significant vulnerability to the water supply” because the Power House was found to be at high risk of collapse during a seismic event. The report concluded, “decommissioning the Power House and relocating the water pumps to a new location is a primary recommendation”.
Fire Protection Reliability: The new pump station will ensure that buildings within the high-pressure water distribution zone have adequate fire protection to support Vancouver Fire Rescue Services.
Powerhouse Site Redevelopment: The new pump station will allow for decommissioning of the Power House, making the site available for development of the planned Sauder School of Business expansion.
Deteriorating Power House Conditions: Power House building requires continued and increasing work to maintain safety and operation.
Learn more
Campus & Community Planning: Planning and development permit.
Stantec: Project profile
Awards
The ACEC-BC Awards for Engineering Excellence: 2022 Municipal & Civil Infrastructure